Manila International Container Terminal | Philippines
Project summary
Images of the project
Context
Restoration works were required at the Manila International Container Terminal (MICT) Berths 1-5.
The structure was generally in poor condition, with significant degradation to the suspended reinforced concrete deck and piles.
The project was carried out in two main phases: detailed inspection prior to works, and design and execution of the repair works.
Our Services
Sixense carried out a visual inspection survey of the condition of the structure. The survey was carried out using our software ‘DigtialSite’, which was used to digitalise the works processes for all stages of the project, including the associated repair works.
Thousands of defects were individually recorded on-site onto the digital version of the structure by adding observations and photographs to DigitalSite via Mobile App. Reports were then generated automatically, which were shared with stakeholders.
Following the inspection, our digital platform was used to monitor the progression of the repair works through an approval workflow, which involved the consultant and client.